Hong Kong Children’s Hospital

- in HOSPITALS
1130

Construction has been started at the Kai Tak Development Area in August 2013, with an aim for completion by 2017. The HKCH is targeted to commence operation by phases in 2018. The Children’s Hospital is the largest Design & Construction building project from the Architectural Service Department of HKSAR, when measured by contract sum. The project has set ambitious sustainability targets to provide world-class healthcare facilities in the region.This is also the first specialist Children’s Hospital in Hong Kong.

  • The site area is about 21,700m2with a 285m long frontage abutting
    the future waterfront promenade of Kai Tak Development.
  • The total construction floor area of HKCH is about 165,000m2.
  • Building separation is about 45m between the two
  • Building set-backs with green terraces
  • Maximization of site greenery coverage at various levels
  • A central landscaped courtyard with entrance pavilion in-between the two towers to create a welcoming arrival node
  • Maximization of ground floor frontage facing both public roads and future waterfront promenade to enhance openness and accessibility
  • Application of sustainable design concept and energy efficient design features including the adoption of district cooling system
  • Child-friendly and age appropriate non-institutional environment with care design to cater needs of patients and families

Hong Kong Children’s Hospital 01

Hong Kong Children’s Hospital 02

Hong Kong Children’s Hospital 03

Hong Kong Children’s Hospital 04

Hong Kong Children’s Hospital 05

Hong Kong Children’s Hospital 07

Hong Kong Children’s Hospital 08

Hong Kong Children’s Hospital 09

Hong Kong Children’s Hospital 010

Hong Kong Children’s Hospital 011

Facebook Comments

Leave a Reply

Your email address will not be published. Required fields are marked *